| S /N | CLIENT | CONTRACT TITLE AND NUMBER | LOCATION | APPROX VALUE | DESCRIPTION OF WORK | | 1 | DELTAAFRIK/MOBIL | 16109-8030 | OFFSHORE NIGERIA | $385,000,000.00 | Contract for the Installation Engineering, fabrication and installation of various pipeline segments (24’’, 20’’, 16’’, and 12.75’’) as well as fabrication and installation of its riser and topsides piping, execution of associated tie-ins, in-place abandonment of the existing pipeline segment, installation of 42’’ subsea repair clamp. | | 2 | SHELL | EPIC Contract for the Offshore Gas Gathering System - OGGS Project. NO. L-01398 | OFFSHORE NIGERIA | $320,000,000.00 | EPIC Contract for the Engineering, Procurement and Construction of the Offshore Gas Gathering System - OGGS Project including the Procurement, Installation, Commissioning and Operations of a high capacity FBE and concrete weight pipe coating plants to coat over 350km of pipe lines consisting of 16”, 24” and 32” and Offshore Installation of the Pipelines. Contract duration – 3 years. | | 3 | SHELL | FYIP Offshore | OFFSHORE NIGERIA | $247,000,000.00 | EPIC Contract for the Provision of Engineering, Procurement, Fabrication, Construction and Installation of Pipelines for the Forcados Yorkri Integrated Project Offshore works . Project duration 3 years. | | 4 | SHELL | FYIP Onshore. NO. W 06381 | ONFSHORE NIGERIA | $245,000,000.00 | EPIC Contract for the provision of Engineering, Procurement, Fabrication, Construction, Installation and Commissioning of the Forcados Yokri Integrated Project Onshore Works. Contract duration – 3 years. | | 5 | MOBIL | OCIP N0. 1430406 | OFFSHORE NIGERIA | $201,000,000.00 | Contract for the Engineering, Procurement and Installation (EPCI) services associated with Wellhead Hook-ups and Modifications, structural Inspections, pipeline and pipeline system repairs modifications, Well slot additions, packaged equipment procurement, process utility, firewater and other piping installations, vessels and tank repairs and installations, instrument and electrical installations and other integrity-related projects (OCIP). Contract duration – 3 years. | | 6 | SHELL | KC Project | OFFSHORE NIGERIA | $152,000,000.00 | EPIC Contract for the Engineering, Procurement, Fabrication of the KCDP-B Jacket and Installation, Construction and Revamp of KC Facilities consisting production platforms and Accelerated Demanning of Bonny Crude Loading Platforms. Contract duration – 24 months. | | 7 | SHELL | | OFFSHORE NIGERIA | $150,000,000.00 | Marine Engineering Contract for the Provision of Offshore Diving and Marine Maintenance Services, topside wellhead platform maintenance, SPM maintenance with dedicated offshore diving support vessels DSV IOSL Discovery and DSV IOSL Explorer. Contract for a duration of 5 years plus option for 2 years extension | | 8 | MOBIL | East Area Projects: EPC 4B. NO. 1430413 | OFFSHORE NIGERIA | $138,000,000.00 | East Area Projects (EPC4B): Contract for Engineering, Procurement, Fabrication, Installation and Commissioning of Wellhead Platforms Retrofit and Revamp including detail design for platform modifications, equipment procurement, structural modifications, pipeline tie-ins, Process and Instrumentation Piping, Hoisting Gears, Cabins, Enclosures and ancillaries, Electrical Installations. | | 9 | MOBIL | Wellhead Revamp NO. 2430012 | | $110,000,000.00 | Provision of Engineering, Procurement, Fabrication, Installation of Wellhead retrofit and Revamp works, Repairs of Risers, maintenance of offshore structures, topside and subsea works etc. - Contract Duration - 3yrs. | | 10 | CHEVRON | SOWIP. NO. FAC-2003- 10024530 | OFFSHORE NIGERIA | $100,000,000.00 | EPIC Contract for the provision of Engineering, Procurement, Fabrication, Construction, Installation and Commissioning of the South Offshore Water Injection Project - SOWIP including the Fabrication and Installation of Okan E Platform, Revamp of DSWIP, Retrofit Works on Remote Platforms and Laying of Water, Gas and Production Lines | | 11 | MOBIL | FMS Project. No. 2550358 | OFFSHORE NIGERIA | $80,000,000.00 | Provision of Field Maintenance & Minor Construction Engineering Services - FMS Project including the Inspection, Testing, Maintenance, Repair, Fabrication, Installation or Replacement of Flow Elements / Flowlines, Decking (including Helidecks), Pipeline Integrity, Pressure Vessels, Submarine Lines, Anchors and Anchor Chains, Firewater System, Platform Structures, Valves and Fittings, SPM Buoys and Lines installed for open sea crude oil tanker moorings, Cathodic Protection Systems, Marine Risers and Structural Steel members, Boat Landing Fenders, Process and Instrumentation Piping, Hoisting Gears, Cabins, Enclosures and ancillaries, Electrical Installations, Generators, Pumps and Motors, Instrumentation Systems, Ancillaries such as Batteries, Solar Panels and Navigational Aids, Grit-blasting and Painting of Structural Steel Piping and other Surfaces | | 12 | NALIN | | ONFSHORE NIGERIA | $65,000,000.00 | Provision of Engineering and Turnkey construction, installation and commissioning of palm kernel cracking, crushing and refining factory complex inclusive of all facilities | | 13 | SHELL | | OFFSHORE NIGERIA | $50,000,000.00 | Contract for the Provision and hire of 2 units of heavy land drilling rigs; 2000HP for land drilling and workover operations. Contract duration - 3 years. | | 14 | BRASS | | OFFSHORE NIGERIA | $50,000,000.00 | EPIC Contract for the Provision of Engineering, Procurement, Fabrication and Installation of Pipelines, jackets, production platform installations, 50km of linepipes of 4” to 12” in shallow water, installation of 1000 tons of structures at Offshore OPL 230 Field. | | 15 | CHEVRON | EPIC Contract for OKAN Production Platform works. NO. FAC-2002-10030330 | OFFSHORE NIGERIA | $40,000,000.00 | EPIC Contract for the Provision of Engineering, Procurement, Construction, Installation and commissioning of OKAN Production Platform works to include modification to existing equipment to direct bulk fluids from the production headers on OKAN production facility directly to slug catching vessels. Fabrication and installation of two (2) 33" piles to 220" penetration inside the existing frame of the platform. Fabrication, installation and commissioning of three main equipment modules and performance of on-site platform modification, miscellaneous piping, structural, electrical and instrumentation. | | 16 | MPN | Critical Crude Pipe Coating Services | ONFSHORE NIGERIA | $40,000,000.00 | Furnishing and Application of Fusion-Bonded Epoxy (FBE) Corrosion Coating and Concrete Coating of line pipes involving the following pipelines 24” Ubit – QIT pipeline segment replacement 24” Idoho – QIT pipeline segment replacement 20” Asabo – Usari pipeline segment replacement | | 17 | ADAMAC PIPES AND COATING SERVICES LIMITED | Adamac Pipes and Coating Mill Project. | OFFSHORE NIGERIA | $35,627,000.00 | Provision of Turnkey engineering, construction and installation of a pipe coating mill at Onne consisting of integrated power plant of 20 Megawatts, office buildings, workshop, warehouses, road network, storage yard, 700 metres quay and loadout facilities, etc. | | 18 | ESTHER PROPERTIES LIMITED | | OFFSHORE NIGERIA | $28,625,000.00 | Provision of Engineering and Turnkey construction of integrated oilfield centre located in Port Harcourt consisting of office buildings, workshops, warehouses, storage yards, storage facilities, installation of machines and commission. | | 19 | ALLIANCE OFFSHORE LIMITED | | OFFSHORE NIGERIA | $26,500,000.00 | Provision of Engineering and Turnkey construction of harbour facilities, supply and installation of all equipment for the offshore support, load out slipway and commissioning | | 20 | SHELL | EPIC Contract for Bonny Terminal crude loading tanks. | OFFSHORE NIGERIA | $26,000,000.00 | EPIC Contract for the Provision of Engineering, Procurement, Fabrication, Installation and Refurbishment and maintenance of Bonny Terminal crude loading tanks. | | 21 | SUFFOLK PETROLEUM SERVICES LIMITED | | ONFSHORE NIGERIA | $25,000,000.00 | Provision of Engineering and Turnkey construction of integrated marine facility consisting of quay, office buildings, workshops and warehouses, hotel facilities, road network, and load out facilities in Rumuolumeni. | | 22 | CHEVRON | TIP. No. FAC - 2002 - 10030289 | OFFSHORE NIGERIA | $22,000,000.00 | Contract for the transportation and installation of pipelines, flowlines and offshore structures, offshore Escravos. | | 23 | MOBIL | Provision of dedicated Offshore diving vessel and maintenance services | OFFSHORE NIGERIA | $18,000,000.00 | Marine Engineering Contract for the Provision of dedicated Offshore diving vessel and maintenance services for Offshore Pipelines and Subsea Works utilising the vessel DSV SPSL Krantor. Contract duration – 3 years | | 24 | SHELL | UQCC Terminal Crude Loading and Storage tanks. | OFFSHORE NIGERIA | $18,000,000.00 | EPIC Contract for the Provision of Engineering, Procurement, Fabrication, Installaation and Refurbishment and maintenance of UQCC Terminal Crude Loading and Storage tanks. | | 25 | SHELL | SRM Actuators, spare parts and installation and maintenance services. | OFFSHORE NIGERIA | $18,000,000.00 | Contract for the Procurement and supply of over 1,000 units of SRM Actuators, spare parts and installation and maintenance services. Contract duration – 3 years. | | 26 | HUNTING OIL FIELD SERVICES LIMITED | | OFFSHORE NIGERIA | $17,800,000.00 | Provision of Engineering and Turnkey construction, installation and commissioning of Tubular goods consisting of premium pipe treading, pipe coating and treatment, storage facility at Onne. | | 27 | MOBIL | Idoho Field Production Platform Revamp | OFFSHORE NIGERIA | $15,700,000.00 | EPIC Contract for the Revamping of production platform, de-mobilization of existing structures, hookup utility systems, pumps, scrubbers, flare knockout drums, valves, instrumentation, electrical hookup (240,000 man/hours) offshore IDOHO Field | | 28 | SHELL | Wellhead Maintenace Services. | OFFSHORE NIGERIA | $10,000,000.00 | Maintenance Contract for the Provision of wellhead maintenance services for the Onshore and Offshore wellhead Installations. Contract duration – 3 years. | | 29 | SHELL | Provision of QA and QC inspection services | ONFSHORE NIGERIA | $10,000,000.00 | Quality Conrol Contract for the Provision of QA and QC inspection services. Contract duration – 3 years. | 30 | SHELL | | OFFSHORE NIGERIA | $8,000,000.00 | Contract for the Procurement and supply of 30 units of AVA RHD packers, installation and provision of running services | | 31 | MOBIL | Repairs of 12” damaged pipeline, Riser Fabrication and Installation Offshore. | OFFSHORE NIGERIA | $7,800,000.00 | EPIC Contract for the Engineering and Construction of Ubit ‘B’ to Mfem ‘A’. Repairs of 12” damaged pipeline, Riser Fabrication and Installation Offshore. Contract duration – 12 months | | 32 | MOBIL | | OFFSHORE NIGERIA | $6,500,000.00 | EPIC Contract for the Engineering, Construction and Installation of 6” x 10” sealines, Risers. Installation of 3 pancakes, hook up and Commissioning. | | 33 | CROSS RIVER STATE WATER BOARD | | ONFSHORE NIGERIA | $6,399,987.00 | Provision of Engineering design of boreholes and drilling works, repair, supply and installation of mechanical and electrical equipment; refurbishment of treatment works; repair of buildings and reservoirs; supply of spare parts and laboratory equipment; On the Job Training, testing and commissioning (FCR-01-IC) | | 34 | MOBIL | | OFFSHORE NIGERIA | $6,000,000.00 | EPIC Contract for the Engineering, Fabrication, Construction and Installation of Helideck Extension on 34 Offshore Platforms (Phase 1&2). | | 35 | TEXACO | | OFFSHORE NIGERIA | $4,500,000.00 | EPIC Constract for the Engineering, Procurement, Construction and Laying of 6” x 10” sealine, and deck installation, Caisson installation. Flare relocation Offshore Pennigton | | 36 | ADDAX | | OFFSHORE NIGERIA | $4,100,000.00 | Provision of Engineering and emergency repair of 4” and 6” offshore pipelines | | 37 | AGIP | | OFFSHORE NIGERIA | $4,000,000.00 | Contract for the Procurement, installation and running of various completion equipment, AVA RHD packers, SRM Actuators, spare parts and accessories. Contract duration – 3 years. | | 38 | TEXACO | | ONFSHORE NIGERIA | $3,800,000.00 | EPIC Contract for the Provision of Engineering, Procurement, Construction and Installation including disconnect existing manifold, piping, skid mounted process equipment, (test separator, fuel/instrument gas scrubber, sump tank), install new control panels, hook up gas lines, install new flowlines, install pipeline riser. | | 39 | EDO STATE URBAN WATER BOARD | EED-01-IC | OFFSHORE NIGERIA | $3,753,030.00 | Provision of Engineering design, civil works involving construction of road and staff quarters; mechanical and electrical works; general building refurbishment; fabrication of stop-log elements for the dam; dam/weir and intake improvement; redevelopment of borehole/drilling of new borehole; provision of operational support facilities; On the Job Training, testing and commissioning (EED-01-IC) | | 40 | ANAMBRA STATE WATER CORPORATION | FAN-01-IC | OFFSHORE NIGERIA | $3,600,000.00 | Provision of Engineering design, drilling of borehole works, repair, supply and installation of mechanical and electrical equipment; refurbishment of treatment works; repair of buildings and reservoirs; supply of spare parts and laboratory equipment; On the Job Training, testing and commissioning (FAN-01-IC) | | 41 | SHELL | FAN-01-IC | OFFSHORE NIGERIA | $3,600,000.00 | Contract for the Provision and rentals of OMEGAMATIC retrievable squeeze packers, accessories for drilling and workover operations, etc. Contract duration – 3 years | | 42 | ELF | | OFFSHORE NIGERIA | $3,100,000.00 | Contract for the Procurement, installation and running of various completion equipment, AVA RHD packers, SRM Actuators, spare parts and accessories. Contract duration – 2 years. | | 43 | MOBIL | | OFFSHORE NIGERIA | $2,600,000.00 | Provision of Engineering and Repairs of damage to subcellar deck (QI) platform offshore | | 44 | MOBIL | | OFFSHORE NIGERIA | $2,500,000.00 | Provision of Engineering and laying of 8” Sealine and rehabilitation. Riser fabrication and installation at ASABO. | | 45 | DELTA STATE PUBLIC UTILITIES BOARD | EDT-01-IC | OFFSHORE NIGERIA | $2,500,000.00 | Provision of Engineering design and Mechanical and electrical works; general building refurbishment; drilling and redevelopment of boreholes; provision of operational support facilities; On the Job Training, testing and commissioning (EDT-01-IC) | | 46 | MOBIL | | ONFSHORE NIGERIA | $2,200,000.00 | Provision of Engineering and Revamping of offshore Ubit 'B' wellhead platform. | | 47 | ASHLAND. | | OFFSHORE NIGERIA | $2,000,000.00 | Provision of Engineering, Laying of 4” flowlines, Installation of pancake decks and instrumentation, hook up and commissioning Offshore at S.W. ADANGA Field. | | 48 | SHELL | | OFFSHORE NIGERIA | $2,000,000.00 | Provision of Engineering and Topside maintenance services including inspection of crude loading platform offshore Bonny. | | 49 | CHEVRON | | OFFSHORE NIGERIA | $2,000,000.00 | Provision of quality contract and NDT inspection services for line pipes, Casing and tubular goods at Offshore Escravos. Contract duration – 2 years. | | 50 | MOBIL | | OFFSHORE NIGERIA | $1,700,000.00 | EPIC Contract for Provision of Engineering, Procurement and Construction for EDOP B, C, D. Platforms hook up, process control systems, transmitters, solar panels, instruments tubing, navigation system, lighting, fog horns at Offshore EDOP Field. | | 51 | SBM | | ONFSHORE NIGERIA | $1,500,000.00 | Provision of Engineering, Dismantling, Fabrication & Hook up of Helideck extension & remedial work. | | 52 | ABACAN | | OFFSHORE NIGERIA | $1,500,000.00 | Provision of Engineering and emergency repairs of damaged offshore 12" export line at NGO Field. | | 53 | ABACAN | | OFFSHORE NIGERIA | $1,500,000.00 | Provision of Engineering, Procurement and Emergency repair of damaged 16" flare line at Offshore NGO Field | | 54 | ELF | | OFFSHORE NIGERIA | $1,200,000.00 | Provision of Engineering, Fabrication & Hook up of boat landing for tanker FSO XV (70 ton) | | | | | | | |
|